TRINITY MALL
TRINITY MALL
Project details
Automating everything
Opened in 2013. Trinity Leeds, covering almost 100.000 m2 area, is one of the most important city-centre development of recent times. Contracted by Seele Austria, Programming Architecture was responsible for 3D modelling and model-assembly of the roof structure and structural details. To make the task easier, we programmed methods that enable automatic generation of structural details and used them for all of the Trinity Leeds grid shell roofs.